In terms of storage capacity and access efficiency compared to the traditional shelf warehouse has a qualitative leap, but also to meet a variety of special industry access requirements, is also a substantial reduction in labour costs.
The second warehouse of materials stores raw and auxiliary materials with a unit weight of less than 1.5 tons and a relatively small volume. It is proposed to use three tiered three-dimensional shelves, equipped with two AGV trolleys and charging devices; The spare parts warehouse (3 # warehouse) is divided into two parts, one part of which is a three-layer three-dimensional shelf, the other part is stacked to store all large and small spare parts, and two AGV trolleys are equipped. No. 4 warehouse is mainly a storage area for large equipment, steel, large cables and other large materials and waste materials. This warehouse is equipped with vehicles to receive and send goods; a separate warehouse is set for dangerous chemicals such as Oxyacetyleneand lacquer pine perfume, both of which are sent and received manually, but account counting is included in the entire intelligent management system.
Yufeng intelligent for a well-known semiconductor enterprise has a warehouse for intelligent three-dimensional storage transformation. The customer is mainly engaged in the research and development, production and sales of 200mm, 300mm integrated circuit silicon wafer, advanced equipment, advanced materials. With rich field experience and excellent product performance, Yufeng intelligent project team combined with customers' requirements and existing equipment and processes, to provide customers with overall solutions. The scheme adopts the mode of intelligent system combined with the hardware of the reservoir area, and realizes the intelligent operation mode of the storage, picking, checking, distribution and distribution of materials from the warehouse to
The project is composed of shelf system, stacker system, conveyor system, power assisted manipulator system and warehouse management control system. The core equipment is independently developed. Through systematic and scientific periodic testing, the stable and reliable operation of equipment and strong system availability are ensured. The warehouse management system is connected with the mechanical arm equipment to achieve flexible scheduling and efficient and accurate picking.
This project is an intelligent three-dimensional storage system built by Yufeng Intelligent for a state-owned listed enterprise, which is a "turnkey" project. It adopts the current domestic advanced warehousing technology, breaks through the planarization mode of the traditional warehouse, makes full use of the vertical space, and the incoming and outgoing regulated goods are all completed by the double deep stacker. Through industrial automation control and combined with computer information, monitoring management, it realizes the automatic functions of parts warehousing, transportation, turnover, management, etc. Combined with ERP and MES, it can truly realize real-time visualization of material dynamic data, automatic access to materials, and orderly distribution of materials.
The project adopts the double deep position stacker independently developed by Yufeng Intelligent,Double row parallel shelves are equipped on the left and right sides. Each storage shelf can store more than double the number of pallets. Its use not only reduces the floor area of the roadway, but also reduces the number of stackers. Under the same area, the ground utilization rate and access efficiency are greatly improved, and considerable initial investment can be saved for users.
Yufeng Intelligent has provided a set of shuttle car intelligent storage solutions for a well-known household appliance enterprise. Through in-depth analysis of customer demand data, existing equipment, material storage mode, business model, etc. The scheme adopts the mode of intelligent system cooperating with warehouse hardware to realize the efficient operation of material management and control integration with lower enterprise operation cost, higher operation efficiency and better management mode. The shuttle car system of this scheme is mainly composed of a box type shuttle car, a running track, a shelf system, a floor changing elevator, a double station box elevator, and a software control system. The core equipment is independently researched and developed. Through systematic and scientific periodic testing, the stable and reliable operation of the equipment is ensured, and the system is highly available. Through the WMS system, the command is sent to the WCS system to complete the delivery and warehousing of orders, At the same time, it can also monitor the running state of equipment for remote preventive maintenance.
The materials are transported to the first floor by the elevator and the conveyor line, and then connected by the intelligent shuttle car. The shuttle car runs along the predetermined track to carry goods, realizing the storage of goods to the cargo space. The project is seamlessly connected from the production line to the inventory, meeting the customer's demand for production and warehousing according to the order. Advantages of multi-layer shuttle stereoscopic warehouse and strong processing capacity: the processing capacity of multi-layer shuttle stereoscopic warehouse is more than 10 times that of traditional warehouse.
This project design intelligent storage one, layout 3 stacker roadway, 10 rows, 14 rows, 11 layer of automatic shelves, 10 row X14 column X11 layer =1540 cargo space, warehouse weekly box stacking storage, single phase table and three phase table 4 boxes for a stack, low pressure transformer ⒉ box a stack, high voltage transformer not stack (35KV high voltage transformer 1 / support, 10KV high voltage transformer 2 / support), calculated storage 73920 pieces according to the single phase table. The shelf form adopts the ox leg type shelf, equipped with three double extension stacker, automatically run to the designated position to complete the access operation.
Pallet (steel box type) vertical warehouse area (2 sets in total): composite operation efficiency per hour: 70-90 times. Box type (plastic turnover box) vertical warehouse area (2 sets in total): composite operation efficiency per hour: 90-100 times.
The project is designed with four functional areas: packaging area, robot stamping area, automatic warehouse area, warehouse front area. The overall design of three-dimensional warehouse should consider small space occupation, overall compactness, economy, and meet the needs of customers to visit the automated demonstration.
This project is designed with an intelligent warehouse and 3 double extension stacker roadways A total of 10 rows, 14 columns, 11 layers of automated three-dimensional shelves, packing and stacking around the warehouse.